Application · Industry

Upgrade water treatment at your industrial site.

Treatment capacity, discharge quality, energy use and available space: Akelion studies your constraints to propose an upgrade, a compact plant or smarter control.

Symptoms

Do you recognize your plant?

It's saturated

New line, higher output: the plant reaches its capacity and there is no land to expand it.

Its discharges exceed limits

Tight discharge agreement, surcharged pollution load, a more demanding prefectural order (the operating permit issued by the French State).

It uses too much energy

Aeration and filtration weigh on the energy bill, with settings that don't follow production.

Water is becoming scarce

Restrictions, water prices, CSR goals: reusing treated water becomes a site-wide issue.

Choose

Three situations, three answers.

A starting point, not a verdict: the study of your effluent and your site confirms the solution and its sizing.

You have a biological plant that can no longer keep up. Existing basin, limiting clarifier, irregular discharge.

Dynafilter® Upgrade the plant in place: submerged membrane filtration replaces settling, with no extra basin to build.

See Dynafilter

You have no plant, or it needs to be doubled. New site, new line, limited space.

Dynatank A compact plant in an ISO tank container, delivered tested, from 5 to 100 m³/day, that grows with standard components.

See Dynatank

Your plant works, but you're always reacting. Fixed settings, high consumption, time-consuming monitoring.

Neural Water Management Advanced control that adapts filtration and aeration to operating conditions, after a compatibility study.

See smart control

Preparing the study

The data that saves time.

None of it is mandatory for a first conversation: share what you have, and we will identify together what is missing.

  • Flows and variations

    Average and peak flow, production calendar, cleaning and shutdowns.

  • Available analyses

    COD, BOD, TSS, nitrogen, pH, temperature, fats: even partial ones.

  • Discharge and objectives

    Current discharge method, agreement or prefectural order, reuse project.

  • Integration prerequisites

    Space and access, existing structures, pretreatment, power supply, existing automation.

Method

Measure on your effluent before investing.

Two pilot units can qualify the filtration or the complete process on your site, without shutting down your plant.

Scoping

Discussion, available data, objectives and additional analyses.

Pilot trial

Dynafilter or Dynatank pilot unit installed on site for a few weeks.

Measurements

Permeate quality, flux, consumption and stability monitored continuously.

Offer

Campaign report, sizing and scope of supply.

Contact

Let's talk about your site.

Describe your business, your effluents and your main constraint: we will point you to the right solution and project organization.

Workshop
10 rue du Sauvignon
34800 Clermont-l'Hérault, France
Preferred contact

Akelion uses this information to answer your request and follow up on your project. Fields marked with an asterisk are required for us to reply. For recipients, retention periods and your rights, see our privacy policy.