It's saturated
New line, higher output: the plant reaches its capacity and there is no land to expand it.
Application · Industry
Treatment capacity, discharge quality, energy use and available space: Akelion studies your constraints to propose an upgrade, a compact plant or smarter control.
Symptoms
It's saturated
New line, higher output: the plant reaches its capacity and there is no land to expand it.
Its discharges exceed limits
Tight discharge agreement, surcharged pollution load, a more demanding prefectural order (the operating permit issued by the French State).
It uses too much energy
Aeration and filtration weigh on the energy bill, with settings that don't follow production.
Water is becoming scarce
Restrictions, water prices, CSR goals: reusing treated water becomes a site-wide issue.
Choose
A starting point, not a verdict: the study of your effluent and your site confirms the solution and its sizing.
You have a biological plant that can no longer keep up. Existing basin, limiting clarifier, irregular discharge.
Dynafilter® Upgrade the plant in place: submerged membrane filtration replaces settling, with no extra basin to build.
See DynafilterYou have no plant, or it needs to be doubled. New site, new line, limited space.
Dynatank A compact plant in an ISO tank container, delivered tested, from 5 to 100 m³/day, that grows with standard components.
See DynatankYour plant works, but you're always reacting. Fixed settings, high consumption, time-consuming monitoring.
Neural Water Management Advanced control that adapts filtration and aeration to operating conditions, after a compatibility study.
See smart controlPreparing the study
None of it is mandatory for a first conversation: share what you have, and we will identify together what is missing.
Average and peak flow, production calendar, cleaning and shutdowns.
COD, BOD, TSS, nitrogen, pH, temperature, fats: even partial ones.
Current discharge method, agreement or prefectural order, reuse project.
Space and access, existing structures, pretreatment, power supply, existing automation.
Method
Two pilot units can qualify the filtration or the complete process on your site, without shutting down your plant.
Discussion, available data, objectives and additional analyses.
Dynafilter or Dynatank pilot unit installed on site for a few weeks.
Permeate quality, flux, consumption and stability monitored continuously.
Campaign report, sizing and scope of supply.
Contact
Describe your business, your effluents and your main constraint: we will point you to the right solution and project organization.