Application · Campsites and hospitality

Plan wastewater treatment and water recycling for your campsite.

Season, occupancy, available space and guest expectations: the project has to fit the way your property runs. BlueGuest® offers a compact answer; Dynafilter® can be studied to upgrade an existing plant.

BlueGuest, SETT d'Or 2026 finalist · outdoor hospitality innovation award

Your questions

What site managers ask themselves.

What about August?

The plant has to absorb peak occupancy, then spend the winter almost idle and restart in the spring.

Where should it go?

Every square meter counts: footprint, maintenance access and connections are planned around your pitches.

Will my guests see it?

Odors, noise, landscape integration: discretion is part of the specifications of any site that welcomes the public.

Can I reuse the water?

Watering, cleaning: the study starts from the intended uses, the available volumes and the conditions applicable to your site.

Two answers

A new plant or a plant to upgrade.

You are creating or replacing your wastewater treatment No plant, saturated septic tank, installation at the end of its life.

BlueGuest A compact plant in a tank container: 15 m² footprint, 300 PE for the 28 m³ version, water ready for reuse within the uses authorized for your site.

See BlueGuest

Your plant exists but can no longer keep up Biological basin in place, irregular discharge during the season.

Dynafilter® Upgrade the existing plant with submerged membrane filtration, with no extra basin.

See Dynafilter

Preparing the study

Five pieces of information are enough to start.

The rest is worked out together, during the preliminary study and the site visit.

  • Capacity

    Number of pitches, rental units or rooms, and facilities (swimming pool, restaurant).

  • Occupancy by season

    Opening dates, occupancy rates, peak periods.

  • Current wastewater treatment

    Type of installation, discharge method, problems encountered.

  • Space and access

    Planned location, access for delivery and maintenance.

  • Uses of treated water

    Watering, cleaning or other uses you would like to study.

The journey

From the first call to commissioning.

First conversation

30 minutes to understand your property and your constraints.

Preliminary study

Sizing and layout based on your data.

Offer

Configuration, options and each party's scope.

Installation

Delivery possible in less than 3 months, commissioning outside the season.

Contact

Let's study your property.

Capacity, seasonality, main constraint: describe your site, and we will prepare the preliminary study.

Workshop
10 rue du Sauvignon
34800 Clermont-l'Hérault, France
Preferred contact

AKELION uses this information to answer your request and follow up on your project. Fields marked with an asterisk are required for us to reply. For recipients, retention periods and your rights, see our privacy policy.